Archive summary
Infill bridge across the Belaya opens to traffic
The new bridge on the alignment of Vorovskogo Street was built between two existing crossings. According to RBC, the structure is 688.8 metres long. It opened with three outbound lanes.
Context
The infill bridge complemented the existing transport junction rather than replacing all the crossings. The three outbound lanes describe the layout at opening; current traffic arrangements should be checked separately.